Port Of Miami

Project Description:

The project consists in the design and construction of three (3) 3,000-track feet of working tracks each; the design and construction of a site layout that provides maximum

operational efficiency for the loading/unloading system of cargo containers onto rail cars utilizing reach stackers; the design and construction of a paved loading apron area, a

circulation roadway within the Rail Intermodal Yard, demolition of existing structures, construction of an access roadway to the yard with driveway tie-ins, and improvements to

PortMiami facilities and structures. The project also includes new drainage, signing and pavement markings, 15 new high mast lightings and 2 new power service installations, and

security fencing, relocation of ATT communication duct bank feeding the complete Port, and the relocation of PortMiami secure fiber duct bank.

As a change order to the base contract a complete Radiation Portal is currently starting the installation phases.

Our Customers Acknowledgement:

“The Florida Sol team understood the importance of the Intermodal Container Transfer Facility for the PortMiami and Florida East Coast Railway, and took every precaution to provide a ‘world class’ electrical backbone and the associated infrastructure and equipment to meet the needs of the project and client.

Florida Sol was a key partner on this 4 phase Design-Build project. Throughout the contract, they never missed a step and exceeded our expectations at every turn. A quality job by an exceptional subcontractor.

The efforts of Florida Sol and the dedication by your team significantly contributed to the overall success of this project. Gonzalez & Sons looks forward to working with Florida Sol again in the future.” – Jonathan Slaton

FacebookTwitterGoogle+Share